Road Map for Sand dam implementation

Practical implementation steps include:

  • Site selection and community involvement;
  • Engineering and design;
  • Water use assessment;
  • Excavation and construction;
  • Operation and maintenance (establishment of water management process, including: Water committee, care takers and provision of trainings)
  • Monitoring and evaluation

 

  • The presence of communities (nomads or permanently during dry period)
  • The slope of the river beds: the most suitable locations have a slope between 2 to 4 percent)
  • Average width of the river, which should not exceed 25-50 meter
  • The rivers should be underlain by bedrock
  • Strong raised river banks 

The sand dam construction process is always unique for each site since it depends on topography, availability of local materials and community participation.